Design Review Board holds final meeting
The Southeast Design Review Board (DRB) held its final meeting on the project. At the meeting the developer presented a plan to keep the truck entrance on Weller despite strong public opposition and prior DRB opposition to that departure. The final vote on the project was 3-2, a just-passing endorsement of the project.
